Utah Army National Guard's 19th Special Forces Facility This facility was built for the Utah Army National Guard's 19th Special Forces. This project consists of approximately 20+ acres and over 80 feet of vertical drop from one side of the property to the other. Creative design techniques for grading and drainage were used to help
Seasons on Skyline The Seasons on Skyline residential project covers roughly 10.4 acres in South Ogden, Utah. This project included seven apartment buildings, forty townhomes, a club house, and several amenities. There is roughly 12’ of fall from east to west and south to north. One of the challenges with this project was designing the
World's Largest Tunnel Carwash This project is the world’s longest tunnel carwash. The original design had to be squeezed to fit with the addition of a right-turn lane that was required by UDOT. Due to this reduction in length and the grades required for the carwash, retaining walls were required on both ends of the
Wild Goose Estates This is a single family residential 7 lot subdivision in Sandy, Utah. The project was a low impact development (LID) project with a private street and storm drainage system that minimizes the impact of storm drain into the public system. The private road sloped to the west, which allowed the storm water
This was the most challenging project that I have worked on in my career…[the] team at Benchmark Engineering did a magnificent job of satisfying all of these issues to make a beautiful project. - Kevin L. Ludlow The Canyon Slope Square project in Holladay, Utah is a commercial development including a Hyatt Place Hotel, retail
Senior Housing The project consisted of a club house, pool, putting green, deck and spa with 99 living units for seniors. The project was on 3.53 acres and the living area building is 33,668 square feet. Owner’s services included: Surveying property Creation and approval of subdivision plat Site Design of development Coordination with local officials
31 Lot Subdivision The project is a 31 lot subdivision. The project is a gated community PUD. All of the infrastructure has been completed and 11 of the 25 homes have been completed and all but 3 of the lots have been sold. The project is located on 6.6 acres with an average lot size
55+ Senior Community The project has been phased. Each building was built as a phase. 5 buildings have been completed with 68 condominiums. The Senior 55+ condos were built started being built in 2005. The original design had 3 additional phases plan but Phase 6 has changed to an assisted living building that will have
The ACE Disposal project cost approximately $7.1M. The architect, Dave Robinson, incorporated many green items into the building, such as radiant floor heating/cooling, sun shades on some of the exterior windows, R32.5 insulation on the roof areas, etc. Also incorporated was recycled concrete for the majority of fill materials used on the project. Site work