Ace Disposal

The ACE Disposal project cost approximately $7.1M.

The architect, Dave Robinson, incorporated many green items into the building, such as radiant floor heating/cooling, sun shades on some of the exterior windows, R32.5 insulation on the roof areas, etc. Also incorporated was recycled concrete for the majority of fill materials used on the project.

Site work included approximately 10,000 feet of 6’ deep trenches with approximately 90,000 feet of tubing for ground heat/cooling source.

CNG fuel for several of their trucks is being incorporated.  The CNG station is sized to accommodate the majority of his fleet in the future.